Dec 10 (2005). Bundled up...
|
|
 |
Dec 20. Light snow.
|
|
 |
Dec 26. Getting the 2x10 joists in place.
|
|
 |
Dec 27. What balance!
|
|
 |
The newly installed hose faucet on the south wall (work by our plumber David Parrott).
|
|
 |
Inspection approval sticker!
|
|
 |
Applying spray foam insulation in addition to styrofoam sheet insulation.
|
|
 |
Then fiberglass insulation batting... 6-inch, R-19.
|
|
 |
The foundation vents are in place (automatic vents, close at temps of 40 degrees or less).
|
|
 |
It takes a family to build our sunroom...
|
|
 |
Recognize the knee pads, Jeremy?
|
|
 |
Getting there...
|
|
 |
Catching up on her email upstairs while the guys work...
|
|
 |
Almost halfway (with the first layer of the floor, that is...) (Also notice a layer of heavy plastic over the insulation).
|
|
|